Eyebrow Menu

News

January 8, 2016
You may have wondered why most people feel comfortable when the temperature is between 70º and 74º although the normal body temperature is much warmer, 98.6°. The answer is that the body has its own heating system, which generates more heat than we require, and the excess is continually given off to the surrounding air. Since our body creates its own heat, the purpose of a...
January 8, 2016
This page describes how to service a Weil-McLain boiler that has been either partially or fully submerged under freshwater or saltwater.
January 8, 2016
When the topic of increasing residential boiler efficiency comes up, a heating professional can evaluate the current heating system and make a recommendation on how to decrease heating costs by improving home heating efficiency. Guy Denommee, President of Denommee Plumbing &...
November 3, 2015
Contractor Name Mark DeMarse, U.P. Plumbing and Heating Inc., Escanaba, Michigan Job Location Island Resort and Casino, Harris, Michigan Job Description Commercial Laundry. The Resort has over 300 hotel rooms, a convention center and three restaurants. When the hotel opened this spring, they found the installed domestic water heating system (Four 100-gallon, 240,000 BTU...
November 3, 2015
Contractor Name Bernie Salamie, Capital Climate Services, Hyattsville, Maryland Job Location St. Luke Institute, a private residential facility for clergy Job Description Removal of two 50 year-old triple pass fire tube gas/oil boilers and replace with eight Ultra Gas Boilers Facility Square Footage & Load...
November 3, 2015
Contractor Name Clint & Paul Roberson, Roberson Plumbing & Heating  Mike Brassard, Heating Manager at Howland Pump & Supply Job Location Best Western University Inn, a 100-room hotel in Canton, New York Facility Square Footage & Load Requirement Building requirements are 1,500,000 BTU for heating and domestic hot water
November 3, 2015
Contractor Name Joseph Hansen, Hansen Mechanical Inc. Villa Park Illinois Job Location Grace Church, Hinsdale, Illinois Job Description Removal of a 60-year-old two-pass fire tube boiler and installation of three LGB-6s