Hybrid Hydronic Heat + DHW for Residential Homes

Hybrid Hydronic Heat + DHW for Residential Homes

The ECO™ Hybrid System with Integrated Heat Pump A Contractor’s Perspective on Delivering Comfort, Savings with Hybrid Heat Pump System When a homeowner in the Chicagoland area wanted to improve energy efficiency and lower propane heating costs, contractor James Downs of JMD Associates recommended an innovative solution: the ECO™ Hybrid Dual Fuel Hydronic System from…

Walthers Residence

Walthers Residence

WALTHERS RESIDENCE New Milford, PA DECEMBER 7, 2016 New Weil-McLain Boiler Installation Drives Home Energy Savings The owner of a 2,800-square foot home in New Milford, Penn., was experiencing uneven heat throughout the residence, limited hot water and high utility costs. The installation of a new hydronic heating system helped drive home significant energy savings…

Saucon Valley Country Club Weyhill Guest House

Saucon Valley Country Club Weyhill Guest House

Boiler Replacement Needs: A historic guest house at a Pennsyvania country club required replacement of a steam heating system. At 50 years old, the heating system was nearly as old as the country club and was failing. Facility needs included higher efficiency, longtermcost savings, smart features and increased reliability. Project Installation Date: September 2015 Type…

Mendota Apartments

Mendota Apartments

Boiler Replacement Needs: The Mendota, a historic apartment building in Washington, D.C., was heated by a 40-year-old gas steam boiler which fired all day long and never shut off. Building tenants reported that they either didn’t have enough heat or that it was too warm. The cost of natural gas annually had become an enormous…

Media Station Apartments

Media Station Apartments

Installing Contractor: GM Mechanical Project Installation Date: 2010 Location: Lansdowne, PA Type of Facility: Multi-Unit Apartment Complex Age of Facility: 32 years old at time of installation Building Size: 1,297,000 square feet Building Load, Heat Loss: 4.4 million Construction Details: Total Number of Construction Phases: 3 Total Number of Units Required for Job: 10 Solution:…

U.S. Army Reserve Center

U.S. Army Reserve Center

U.S. ARMY RESERVE CENTER Morgantown, WV OCTOBER 4, 2016 Zone Types: Multiple Zones with Circulators and VFD DrivesProject Installation Date: 2011Location: Morgantown, WVType of Facility: Civil/MilitaryAge of Facility: 30 years old at time of installationBuilding Size: 150,000 square feetBuilding Load, Heat Loss: 6 million BTU/hr.Solution: Nine (9) Weil-McLain® SlimFit® 750 boilers, BACnet® control panelApplication Type: Water Installation Details:This US Army Reserve Center was renovated around LEED…

Bridgeton Housing Authority

Bridgeton Housing Authority

Installing Contractor: Falasca Mechanical Project Installation Date: 2011 Location: Bridgeton, NJ Type of Facility: High Rise Apartment Building Age of Facility: 45 years old at time of installation Building Size: 11-story building with 100 family units Building Load, Heat Loss: 2,600 MBH Solution: Four (4) Weil-McLain¨ SlimFit¨ 750 boilers, three (3) Aqua¨ PLUS Indirect Fired…

Presence Health

Presence Health

Boiler Replacement Needs: A medical facility in Chicago, IL needed to replace an old, leaking 1 million BTU atmospheric steel tube boiler that required multiple service calls and was constantly wasting energy. Project Installation Date: September 2015 Type of Facility: Medical Facility Name of Building: Presence Health Medical Facility Location: Chicago, IL Construction Details: Total…

Zion Episcopal Church

Zion Episcopal Church

With failing boilers and an inefficient heating system, historic Zion Episcopal Church in Oconomowoc, Wis., needed guidance and help. New, high efficiency condensing boilers from Weil-McLain provided the answer to solve their heating woes. Zion Episcopal Church is a Wisconsin landmark founded more than a century and a half ago. In 1846, the Rt. Reverend…