U.S. Army Reserve Center

U.S. Army Reserve Center

U.S. ARMY RESERVE CENTER Morgantown, WV OCTOBER 4, 2016 Zone Types: Multiple Zones with Circulators and VFD DrivesProject Installation Date: 2011Location: Morgantown, WVType of Facility: Civil/MilitaryAge of Facility: 30 years old at time of installationBuilding Size: 150,000 square feetBuilding Load, Heat Loss: 6 million BTU/hr.Solution: Nine (9) Weil-McLain® SlimFit® 750 boilers, BACnet® control panelApplication Type: Water Installation Details:This US Army Reserve Center was renovated around LEED…

Bridgeton Housing Authority

Bridgeton Housing Authority

Installing Contractor: Falasca Mechanical Project Installation Date: 2011 Location: Bridgeton, NJ Type of Facility: High Rise Apartment Building Age of Facility: 45 years old at time of installation Building Size: 11-story building with 100 family units Building Load, Heat Loss: 2,600 MBH Solution: Four (4) Weil-McLain¨ SlimFit¨ 750 boilers, three (3) Aqua¨ PLUS Indirect Fired…

Presence Health

Presence Health

Boiler Replacement Needs: A medical facility in Chicago, IL needed to replace an old, leaking 1 million BTU atmospheric steel tube boiler that required multiple service calls and was constantly wasting energy. Project Installation Date: September 2015 Type of Facility: Medical Facility Name of Building: Presence Health Medical Facility Location: Chicago, IL Construction Details: Total…

Zion Episcopal Church

Zion Episcopal Church

With failing boilers and an inefficient heating system, historic Zion Episcopal Church in Oconomowoc, Wis., needed guidance and help. New, high efficiency condensing boilers from Weil-McLain provided the answer to solve their heating woes. Zion Episcopal Church is a Wisconsin landmark founded more than a century and a half ago. In 1846, the Rt. Reverend…