Home Bridgeton Housing Authority
Share this News

Bridgeton Housing Authority

Installing Contractor: Falasca Mechanical
Project Installation Date: 2011
Location: Bridgeton, NJ
Type of Facility: High Rise Apartment Building
Age of Facility: 45 years old at time of installation
Building Size: 11-story building with 100 family units
Building Load, Heat Loss: 2,600 MBH
Solution: Four (4) Weil-McLain¨ SlimFit¨ 750 boilers, three (3) Aqua¨ PLUS Indirect Fired domestic water heaters, Boiler Modulating Control (BMC) panel
Application Type: Water

Installation Details:
Replace age old steel Boilers with more energy efficient condensing boilers. Replace existing direct fired domestic hot water heaters with greater operating efficient units. A quantity of four (4) Weil McLain SlimFit 750 Condensing Boilers were installed in a Multiple Boiler Design. A total of three (3) Aqua PLUS 119 indirect fired water heaters were also installed to provide domestic hot water. A BMC energy management control panel supplied by Weil-Mclain will optimize boiler efficiency by stage firing individual boilers in a 20:1 system turn down ratio. Domestic hot water will also be controlled using the BMC energy management control panel based on DHW demand. This project was designed by Rob Spencer, Principal Engineer at Spencer Engineering.

  • St. Paul Catholic Church in Valparaiso, Ind., Sings Praises of Weil-McLain SVF Boiler

    Heating the Faithful: A Success Story of Comfort and Efficiency St. Paul Catholic Church in…

    Read More about St. Paul Catholic Church in Valparaiso, Ind., Sings Praises of Weil-McLain SVF Boiler
  • From Cupcakes to Comfort: Weil-McLain’s Enduring Legacy Powers 45-Year Residential and Culinary Odyssey

    For over four decades, Loretta Oswald’s home in Bath, Penn., has been powered by a…

    Read More about From Cupcakes to Comfort: Weil-McLain’s Enduring Legacy Powers 45-Year Residential and Culinary Odyssey
  • Ontario Office Building Achieves Optimal Heating Performance, Increases Efficiency with Upgraded Boiler System

    A multi-story office building in Ontario sought to upgrade its two-stage boiler and replace its…

    Read More about Ontario Office Building Achieves Optimal Heating Performance, Increases Efficiency with Upgraded Boiler System