Eyebrow Menu

apartment building

Mendota Apartments

November 2, 2016

Boiler Replacement Needs: The Mendota, a historic apartment building in Washington, D.C., was heated by a 40-year-old gas steam boiler which fired all day long and never shut off. Building tenants reported that they either didn’t have enough heat or that it was too warm. The cost of natural gas annually had become an enormous expense, and as the heating system became less reliable over the years, the Mendota board of directors needed a better solution. 

Media Station Apartments

September 30, 2016

Installing Contractor: GM Mechanical
Project Installation Date: 2010
Location: Lansdowne, PA
Type of Facility: Multi-Unit Apartment Complex
Age of Facility: 32 years old at time of installation
Building Size: 1,297,000 square feet
Building Load, Heat Loss: 4.4 million
Construction Details: Total Number of Construction Phases: 3
Total Number of Units Required for Job: 10

Bridgeton Housing Authority

September 23, 2016

Installing Contractor: Falasca Mechanical
Project Installation Date: 2011
Location: Bridgeton, NJ
Type of Facility: High Rise Apartment Building
Age of Facility: 45 years old at time of installation
Building Size: 11-story building with 100 family units
Building Load, Heat Loss: 2,600 MBH