October 4, 2016
Zone Types: Multiple Zones with Circulators and VFD Drives Project Installation Date: 2011 Location: Morgantown, WV Type of Facility: Civil/Military Age of Facility: 30 years old at time of installation Building Size: 150,000 square feet Building Load, Heat Loss:...
September 30, 2016
Installing Contractor: GM Mechanical Project Installation Date: 2010 Location: Lansdowne, PA Type of Facility: Multi-Unit Apartment Complex Age of Facility: 32 years old at time of installation Building Size: 1,297,000 square feet Building Load, Heat Loss: 4.4...
September 23, 2016
Installing Contractor: Falasca Mechanical Project Installation Date: 2011 Location: Bridgeton, NJ Type of Facility: High Rise Apartment Building Age of Facility: 45 years old at time of installation Building Size: 11-story building with 100 family units Building Load,...
August 25, 2016
Boiler Replacement Needs: A medical facility in Chicago, IL needed to replace an old, leaking 1 million BTU atmospheric steel tube boiler that required multiple service calls and was constantly wasting energy. Project Installation Date: September 2015 Type of Facility: Medical Facility Name of Building:...
August 11, 2016
With failing boilers and an inefficient heating system, historic Zion Episcopal Church in Oconomowoc, Wis., needed guidance and help. New, high efficiency condensing boilers from Weil-McLain provided the answer to solve their heating woes.