December 7, 2016
New Weil-McLain Boiler Installation Drives Home Energy Savings The owner of a 2,800-square foot home in New Milford, Penn., was experiencing uneven heat throughout the residence, limited hot water and high utility costs. The installation of a new hydronic heating system helped drive home significant energy savings and ensure that “no place like home” feeling.
November 23, 2016
Boiler Replacement Needs: A historic guest house at a Pennsyvania country club required replacement of a steam heating system. At 50 years old, the heating system was nearly as old as the country club and was failing. Facility needs included higher efficiency, longterm cost savings, smart features and increased reliability. Project Installation Date...
November 2, 2016
Boiler Replacement Needs: The Mendota, a historic apartment building in Washington, D.C., was heated by a 40-year-old gas steam boiler which fired all day long and never shut off. Building tenants reported that they either didn’t have enough heat or that it was too warm. The cost...
October 4, 2016
Zone Types: Multiple Zones with Circulators and VFD Drives Project Installation Date: 2011 Location: Morgantown, WV Type of Facility: Civil/Military Age of Facility: 30 years old at time of installation Building Size: 150,000 square feet Building Load, Heat Loss:...
September 30, 2016
Installing Contractor: GM Mechanical Project Installation Date: 2010 Location: Lansdowne, PA Type of Facility: Multi-Unit Apartment Complex Age of Facility: 32 years old at time of installation Building Size: 1,297,000 square feet Building Load, Heat Loss: 4.4...
September 23, 2016
Installing Contractor: Falasca Mechanical Project Installation Date: 2011 Location: Bridgeton, NJ Type of Facility: High Rise Apartment Building Age of Facility: 45 years old at time of installation Building Size: 11-story building with 100 family units Building Load,...
August 25, 2016
Boiler Replacement Needs: A medical facility in Chicago, IL needed to replace an old, leaking 1 million BTU atmospheric steel tube boiler that required multiple service calls and was constantly wasting energy. Project Installation Date: September 2015 Type of Facility: Medical Facility Name of Building:...
August 11, 2016
With failing boilers and an inefficient heating system, historic Zion Episcopal Church in Oconomowoc, Wis., needed guidance and help. New, high efficiency condensing boilers from Weil-McLain provided the answer to solve their heating woes.
November 3, 2015
Contractor Name Clint & Paul Roberson, Roberson Plumbing & Heating  Mike Brassard, Heating Manager at Howland Pump & Supply Job Location Best Western University Inn, a 100-room hotel in Canton, New York Facility Square Footage & Load Requirement Building requirements are 1,500,000 BTU for heating and domestic hot water
November 3, 2015
Contractor Name Joseph Hansen, Hansen Mechanical Inc. Villa Park Illinois Job Location Grace Church, Hinsdale, Illinois Job Description Removal of a 60-year-old two-pass fire tube boiler and installation of three LGB-6s