“With an estimated annual fuel savings of $12,000, this Weil-McLain system should pay for itself in 6 years.”
Click pics to enlarge
The facility
The original boiler
The original boiler piping
Building the LGB's
Completed project
Contractor Name:
Joseph Hansen, Hansen Mechanical Inc. Villa Park Illinois
Job Location:
Grace Church, Hinsdale Illinois
Job Description:
Removal of a 60-year-old two-pass fire tube boiler and replacing with 3 LGB-6’s
Facility & Load Requirement:
Church operates only on weekends or special events with the school being used alternately only during the week.
Since the major load was split almost in half conversely this allowed us to aggressively decrease the maximum BTU
consumption from 3.5 million on the fire tube to less than 2 million between the three staged LGB’s.
Special Circumstances:
The building was built around the original boiler. This made demolition very difficult with the only
exit a 36” door at the base of an exterior set of stairs. The LGB was the perfect replacement since
we were able to build the boilers in place.
Why Weil-McLain Equipment:
Weil-McLain has always given me the technical support needed for some of our more complicated jobs.
Weil-McLain has been instrumental in my education, as we have proceeded into the times of primary secondary piping.