Weil-McLain Home

"The installation of the high efficiency Weil-McLain Ultra boilers reduced the gas consumption of this facility by 40%. With the cost increase of gas this year, it translates into a savings of $42,104.00 the first year."

Contractor Name:
Bernie Salamie, Capital Climate Services, Hyatesville, MD

Job Location:
St. Luke Institute, a private residential facility for clergy

Job Description:
Removal of two 50 year-old triple pass fire tube gas/oil boilers and replace with 8 Ultra Gas Boilers

Facility Square Footage & Load Requirement:
Building covers over an acre, 3 million BTU

Special Circumstances:
The facility was on an interruptible gas/oil plan with their local utility. To keep the plan savings, the new system was designed to satisfy 85% of the load with the Ultra boilers and 15% with an existing oil boiler.

Why Weil-McLain Equipment:
The Ultra Gas solves all the problems I've had with other low mass boilers. It's small, lightweight, and it eliminates the noise and shaking from "steam engining."

Lessons Learned:
My sales rep. advised me to do primary-secondary piping, but I started in a different direction. After review, primary-secondary piping was the way to go, and it works great.

Click here to download pdf